In Hilmersdorf and Dittmannsdorf, Erzgebirgskreis (Saxony), hybrid towers for turbines of the type E-115 with a hub height of 135 meters were built for our client ENERCON GmbH.
The delivery of the required reinforced concrete segments already took place at the end of 2022. As the location is a snow-sure area, it was decided to postpone the start of assembly until spring 2023.