Windenergyplant Andrup

Germany

Near the town of Haselünne, district of Emsland (Lower Saxony), three new Enercon wind turbines of the type E-126 were erected. We were responsible for the assembly of both the towers (MST) and the turbines (EP 3). A special feature was that the construction method required the tower to be completely installed from steel plate segments connected by bolting. In addition, the system had rarely been erected before.A special feature was that the construction method provided for a complete installation of sheet steel segments connected by bolting (tower) and the turbines were rarely ever installed at the time of erection.

  • pre-assembly steel sheets
  • assembly steel sheet segments
  • coordination large crane work
  • completion of built-in parts & color work

Eckdaten

Company
DTZ Montage & Sanierung GmbH
Type of performance
Plant assembly & cabeling
Tower assembly
Year
2020